Project Galleries

Photos is Worth a Thousand Words

Subcontract HUC Works for Kurma Manis Vestigo Project 2026

Subcontract HUC Works for Kurma Manis Vestigo Project 2026

Provision of Annulus Volume Test (AVT) at WD Flexible Riser 2026

Provision of Annulus Volume Test (AVT) at WD Flexible Riser 2026

Provision of Subcontract Works for Hook-up and Commissioning for BINDU-A (2nd Campaign) 2025

Provision of Subcontract Works for Hook-up and Commissioning for BINDU-A (2nd Campaign) 2025

Provision of Annulus Volume Test (AVT) for Petrofac PM304 Field 2024

Provision of Annulus Volume Test (AVT) for Petrofac PM304 Field 2024

FSO SEPAT Flexible Riser Annulus Inspection 2024

FSO SEPAT Flexible Riser Annulus Inspection 2024

Provision of Accommodation Vessel (AWB) and Other Marine Vessel (AHTS & FCB) for Hook-up and Commissioning for BINDU-A 2024

Provision of Accommodation Vessel (AWB) and Other Marine Vessel (AHTS & FCB) for Hook-up and Commissioning for BINDU-A 2024

Provision of Subcontract Works for Hook-up and Commissioning for BINDU-A (1st Campaign) 2024

Provision of Subcontract Works for Hook-up and Commissioning for BINDU-A (1st Campaign) 2024

Perform Guy Wire Inspection and Greasing for Flare Tip during Turnaround 2023

Perform Guy Wire Inspection and Greasing for Flare Tip during Turnaround 2023

Provision of Materials, Removal and Installation for F-815 Flare Tips and Its Accessories Replacement at Butanol Unit During PCOGD Shutdown 2023

Provision of Materials, Removal and Installation for F-815 Flare Tips and Its Accessories Replacement at Butanol Unit During PCOGD Shutdown 2023

Provision of Pipeline Inspection, Repair and Modification PL368 Laila-Betty Flexible Riser 2023

Provision of Pipeline Inspection, Repair and Modification PL368 Laila-Betty Flexible Riser 2023

Installation of Wrapping on Breach Area of 12-inch Flexible Riser 2022

Installation of Wrapping on Breach Area of 12-inch Flexible Riser 2022

Provision of EPCC E&I Package for Plant Relocation Facilities from Shah Alam to Pulau Indah LOBP 2022

Provision of EPCC E&I Package for Plant Relocation Facilities from Shah Alam to Pulau Indah LOBP 2022

Provision of EPCIC Mechanical Package of Thermal Oil Heater for Plant Relocation Facilities from Shah Alam to Pulau Indah LOBP 2022

Provision of EPCIC Mechanical Package of Thermal Oil Heater for Plant Relocation Facilities from Shah Alam to Pulau Indah LOBP 2022

Annulus Test & Inspection of Flexible Risers for Jitang Project 2021

Annulus Test & Inspection of Flexible Risers for Jitang Project 2021

Civil, Structure & Architectural Construction for Project Kancil 2021

Civil, Structure & Architectural Construction for Project Kancil 2021

Provision of Flexible Riser & Inspection Annulus Test Onboard 2021

Provision of Flexible Riser & Inspection Annulus Test Onboard 2021

To Perform Integrity Inspection and Annulus Testing of 8” Flexible Riser 2021

To Perform Integrity Inspection and Annulus Testing of 8” Flexible Riser 2021

Inspection and Annulus Testing of 5 Lengths of Flexible Riser 2021

Inspection and Annulus Testing of 5 Lengths of Flexible Riser 2021

Demolish Existing Structure & Piling Works for Project Kancil 2020

Demolish Existing Structure & Piling Works for Project Kancil 2020

Provision of Thermal Insulation Coating – HPC 2020

Provision of Thermal Insulation Coating – HPC 2020

Thermal Insulation Coating for 230° Celsius of Live Pipe 2019

Thermal Insulation Coating for 230° Celsius of Live Pipe 2019

Blasting, Painting and Passive Fire Protection (PFP) System 2019

Blasting, Painting and Passive Fire Protection (PFP) System 2019

Chemical Cleaning for Process, Fuel & Seal Gas Internal Pipe during Pre-Commissioning of Semarang EOR Phase 2 2018

Chemical Cleaning for Process, Fuel & Seal Gas Internal Pipe during Pre-Commissioning of Semarang EOR Phase 2 2018

Boroscope Visual Inspection for Internal Pipe during Pre-Commissioning of Semarang EOR Phase 2 2018

Boroscope Visual Inspection for Internal Pipe during Pre-Commissioning of Semarang EOR Phase 2 2018

Blasting, Painting & Passive Fire Protection (PFP) – ANGSI-A 2018

Blasting, Painting & Passive Fire Protection (PFP) – ANGSI-A 2018

MRT Corp–Drainage Work 2018

MRT Corp–Drainage Work 2018

MRT Corp–Rubble Pitching Wall 2017

MRT Corp–Rubble Pitching Wall 2017

Turnpike Synergy Sdn Bhd- Rumah Penghulu 2017

Turnpike Synergy Sdn Bhd- Rumah Penghulu 2017

Chemical Cleaning Internal Pipe of Carbon Steel Duplex during Pre-Commissioning Activities 2017

Chemical Cleaning Internal Pipe of Carbon Steel Duplex during Pre-Commissioning Activities 2017

Flexible riser annulus testing (KIKEH FPSO) 2017

Flexible riser annulus testing (KIKEH FPSO) 2017

Replacement of Flaretip during Turnaround 2017

Replacement of Flaretip during Turnaround 2017

Flexible Riser Annulus Testing (Berantai FPSO) 2017

Flexible Riser Annulus Testing (Berantai FPSO) 2017

Chemical Cleaning Internal Pipe of Carbon Steel Duplex during Pre-Commissioning Activities 2017

Chemical Cleaning Internal Pipe of Carbon Steel Duplex during Pre-Commissioning Activities 2017

Actuated Ball Valve Servicing during Turnaround 2015

Actuated Ball Valve Servicing during Turnaround 2015

Replacement of Spring Support & Spring Hanger (CARPENTER & PATERSON) 2015

Replacement of Spring Support & Spring Hanger (CARPENTER & PATERSON) 2015

Flexible riser repair using Armadillo (polymer based clamp) 2015

Flexible riser repair using Armadillo (polymer based clamp) 2015